mirror of
https://github.com/retroSoC/retroSoC.git
synced 2026-11-04 22:32:36 +00:00
docs(tiny): record R2-P8/P9/P10 human acceptance
The maintainer confirmed human acceptance of TINY-R2-P8, TINY-R2-P9 and TINY-R2-P10 at dev@4466ad0e with all seven CI workflows successful. Record the refreshed evidence roots, the zero-gap single-timestamp ICS55 P10 report, the shared execution source digest, and the unchanged deferrals (long Icarus firmware, full PR/nightly regression, physical/PVT/board qualification, final timing closure). Generated collector records keep phase_accepted=false; acceptance is recorded in this ledger.
This commit is contained in:
1 file changed
+49
@@ -1,5 +1,54 @@
|
||||
# Tiny MCU Verification Record
|
||||
|
||||
## TINY-R2-P8/P9/P10 human acceptance (2026-10-25)
|
||||
|
||||
The maintainer explicitly confirmed human acceptance of TINY-R2-P8,
|
||||
TINY-R2-P9 and TINY-R2-P10 in the development session. The accepted
|
||||
checkpoint is `4466ad0e97b0bce4b9174dfd88dd199fca344ad5` on `dev`, which
|
||||
raises the ICS55 `TINY_P9_NETLIST_WALL_TIMEOUT` default to 14400 seconds.
|
||||
All seven CI workflows for that commit completed successfully (quality run
|
||||
40098377127, development-environment 40098377121, smoke 40098377168, gf180
|
||||
40098377223, sky130 40098377238, ics55 40098377215, ihp130 40098377145).
|
||||
|
||||
The refreshed P8 campaign passed on both profiles (evidence roots
|
||||
`build/ics55-tiny-2026-10-23-19-00-f5281272385f/meta/tiny-r2-p8/` and
|
||||
`build/ihp130-tiny-2026-10-23-19-01-63130ad79b73/meta/tiny-r2-p8/`): the
|
||||
28-test focused suite, full firmware with `P8_RESULT code=0` (2534635 cycles
|
||||
on ICS55, 2283118 on IHP130), synthesis, netlist boot (36449/36069 cycles),
|
||||
observational STA and capture/report.
|
||||
|
||||
P9 has all six source-bound full-frame workloads `workload_passed`
|
||||
(RECOVERY 3097113, QVGA_RGB565 18601599, VGA_YUV422 73938934 cycles,
|
||||
identical on both PDKs) and complete refreshed backend chains on both
|
||||
profiles (IHP130 `build/ihp130-tiny-2026-10-23-18-59-6879efac2bd8/meta/tiny-r2-p9/backend/`
|
||||
with DVP 175649 cycles; ICS55 `build/ics55-tiny-2026-10-24-15-03-8d025610711f/meta/tiny-r2-p9/backend/`
|
||||
with `SIM_TEST_PASS Tiny cycles=177541` in 12886.6 seconds).
|
||||
|
||||
P10 acceptance rests on two complete reports plus the P7 lifecycle legs.
|
||||
IHP130: `build/ihp130-tiny-2026-10-23-18-51-6879efac2bd8/meta/tiny-r2-p10/report/report.json`
|
||||
is `selected_gates_complete` with zero gaps. ICS55: the single-timestamp
|
||||
campaign `2026-10-24-21-30` passed matched, software, audio, camera and
|
||||
backend on the clean accepted commit; `build/ics55-tiny-2026-10-24-21-30-8d025610711f/meta/tiny-r2-p10/report/report.json`
|
||||
is `selected_gates_complete` with zero gaps, and all five stage records
|
||||
share execution source digest
|
||||
`13bdfaaaa90d6ec4dbc8d8d6bb541c9221ee2fd529ecdcfeaed28974eea4b6f3`.
|
||||
Its netlist-dvp passed with `SIM_TEST_PASS Tiny cycles=177541` in 8383.8
|
||||
seconds on a quiet host; the earlier loaded-host pass needed 13317.1
|
||||
seconds, motivating the 14400-second budget. P7 lifecycle acceptance passed
|
||||
on both profiles (`P7_LIFECYCLE_PASS`, 3859487/3863255 cycles).
|
||||
|
||||
The retained ICS55 netlist-dvp host timeouts (exit 124) are budget/host
|
||||
runtime evidence, not DUT failures; no verdict rule, forbidden-marker set or
|
||||
TEST_STATUS requirement was weakened and no historical record was relabeled.
|
||||
Full long-running Icarus firmware, complete PR/nightly regression, fresh VGA,
|
||||
physical/PVT/board qualification and final complete-product timing closure
|
||||
remain deferred or unrun as recorded below; observational negative STA,
|
||||
warning deltas and observe-mode metrics are not reclassified. Historical
|
||||
pending-human-review statements below describe their original checkpoints.
|
||||
Generated collector records keep `phase_accepted=false`; human acceptance is
|
||||
recorded here. This acceptance does not imply final complete-product
|
||||
qualification.
|
||||
|
||||
## Tiny Icarus behavioral repair (2026-10-22)
|
||||
|
||||
The Tiny Icarus behavioral flow failed elaboration with 29 errors on both
|
||||
|
||||
Reference in new issue
Block a user