- Introduced new task in for handling high-performance APU writes with access fault checks.
- Updated to support an expanded resource count, including ownership and IRQ routing for the new APU resource.
- Enhanced to validate IRQ expectations for the newly added APU resource.
- Created for directed verification of APU-P1 APB4 register shell and integrated IRQ ownership topology.
- Added to ensure synchronization between RTL and SDK register ABI.
- Modified to parameterize tests for product modes, improving flexibility in testing.
- Updated to reflect changes in APU memory mapping and ensure correct assertions.
- Enhanced to validate the complete IRQ and resource allocations for the APU.
- Introduced a new testbench for the SDIO wrapper () to validate APB interactions.
- Updated to include IRQ handling for SDIO0 and SDIO1.
- Enhanced to account for performance management of SDIO0 and SDIO1.
- Modified memory map tests to include SDIO base addresses and performance wait offsets.
- Updated pin mapping tests to include SDIO1 signals.
- Created a comprehensive suite of SDIO tests () covering various functionalities including CRC, command engine, DMA, and standalone operations.
- Added a new test for verifying SDIO register parity against the RTL definition.
- Adjusted SOC topology tests to reflect the addition of SDIO in the IRQ and APB fabric.
- Updated memory map tests to include OPI PSRAM address and size definitions.
- Introduced new test suite for OPI PSRAM to ensure RTL and HAL ABI consistency.
- Enhanced script tools tests to validate formal filelists for OPI PSRAM.
- Modified SOC topology tests to incorporate OPI PSRAM bindings and IRQ mappings.
- Updated test files to change instances of ribp_if to apb4_if in various test cases, ensuring consistency with the new APB4 interface.
- Modified assertions and checks in tests to reflect the new APB4 naming conventions, including changes in expected output and input files.
- Adjusted the test descriptions to accurately represent the APB4 functionality being tested, particularly in timer, UART, and GPIO tests.
- Ensured that all relevant paths and file names in the tests are updated to point to the new APB4 implementations, maintaining the integrity of the test suite.